Loan No. and Title: Loan 4454/Grant 0949-KGZ: Issyk‐Kul Environmental Management and Sustainable Tourism Development Project
Contract No. and Title: WW-CW2: Construction of the wastewater collection system and pumping stations in Cholpon-Ata
Deadline for Submission of Bids: 6 March 2026, 11:00 a.m. (Bishkek time)
The Kyrgyz Republic has received financing from the Asian Development Bank (ADB) toward the cost of the Issyk-Kul Environmental Management and Sustainable Tourism Development Project. Part of this financing will be used for payments under the Contract named above. Bidding is open to Bidders from eligible source countries of ADB.
The Ministry of Construction, Architecture, Housing and Communal Services of the Kyrgyz Republic (Minstroy) (“the Employer”) invites sealed bids from eligible Bidders for the construction and completion of WW-CW2: Construction of the wastewater collection system and pumping stations in Cholpon-Ata (“the Works”).
Open competitive bidding – International advertisement will be conducted in accordancewith ADB’s Single-Stage: One-Envelope without Prequalification procedure, and is open to all Bidders from eligible countries as described in the Bidding Document.
Only eligible Bidders with the following key qualifications defined in the Bidding Document may participate in this bidding:
Average Annual Construction Turnover: Minimum average annual construction turnover of 3,000,000 (three million USD) calculated as total certified payments received for contracts in progress or completed, within the last three (3) years.
Contracts of Similar Size and Nature: Participation as a contractor, Joint Venture partner, or Subcontractor, in at least 2 (two) contracts that have been satisfactorily completed within the last 5 (five) years and that are similar to the proposed works, where the value of the Bidder’s participation exceeds $3,200,000* (three million two hundred thousand USD). The similarity of the Bidder’s participation shall be based on(a): Experience in rehabilitation, modernization, or construction of wastewater collection networks with a minimum length of 8 km.
*If the contract value is not in the specific currency, the exchange rate to be used to calculate the value of the contract shall be the selling rate of the
The borrower’s central bank on the date of the contract signing
Construction Experience in Key Activities:
To obtain further information and inspect the bidding documents, Bidders should contact:
Attention: Mr. Askarbek Suleymanovich Toktoshev, Director of PMO
Street address: Turusbekova Street 31
Floor/Room number: 313, PMO office
City: Bishkek
ZIP code: 720001
Country: Kyrgyz Republic
Telephone: + 996 999 177753
E-mail: ikemstdpmo@gmail.com
To purchase the bidding documents in English, eligible Bidders should:
Upon receipt of the Bidder’s letter, the Employer will send the link to the full set of the Bidding Documents for the Bidder to download. The electronic version of the Bidding Document is provided free of charge. The Bidder shall be responsible for ensuring it downloads the full set of documents, and the Employer shall take no responsibility for any consequence under this procurement process or thereafter of the Bidder’s failure to do so.
Deliver your bid
Bids will be opened promptly after the deadline for bid submission in the presence of Bidders’ representatives who choose to attend.
The Employer will not be responsible for any costs or expenses incurred by Bidders in connection with the preparation or delivery of bids.